MPSC ATP Mock Test 1 with answers

एमपीएससी सहायक नगररचनाकार सराव प्रश्नपत्रिका — उत्तरे व स्पष्टीकरणांसह

  • 100 questions
  • 60 minutes
  • +2 right · −0.5 wrong

Free PDF

Download this PDF

Enter your email once and the PDF is yours. We send exam updates and free material; you can stop them any time.

In the print window, choose Save as PDF.

Try each question first. Then tap Show answer.

Topics in this test (19)

Questions and answers

  1. Q1 Current Events & Technology

    Real-Time Kinematic (RTK) GNSS reaches centimetre-level accuracy in the field mainly because it:

    1. AUses signals of geostationary weather satellites in place of GPS
    2. BAverages code pseudoranges of a single receiver over a few seconds
    3. CApplies magnetic compass bearings to correct satellite positions
    4. DUses carrier-phase data with live corrections from a base station or CORS
    Show answerHide answer

    Answer D. Uses carrier-phase data with live corrections from a base station or CORS

    RTK resolves the carrier-phase ambiguity using corrections streamed from a reference station (or CORS network) a few km away, giving cm accuracy instantly; stand-alone code positioning gives only metre-level accuracy.

    Source: GNSS surveying - RTK principle

  2. Q2 Current Events & Technology

    Comet 3I/ATLAS, which made its closest approach to Earth on 19 December 2025, is significant because it is:

    1. Athe third confirmed interstellar object observed passing through the Solar System
    2. Bthe first comet discovered by an Indian telescope
    3. Ca short-period comet returning after 76 years
    4. Da fragment of the Oort cloud captured into Earth orbit
    Show answerHide answer

    Answer A. the third confirmed interstellar object observed passing through the Solar System

    Discovered in July 2025 by the ATLAS telescope in Chile, 3I/ATLAS is the third known interstellar object after 'Oumuamua (2017) and 2I/Borisov (2019); it passed about 269 million km from Earth (PBS NewsHour).

    Source: https://www.pbs.org/newshour/science/interstellar-comet-3i-atlas-will-make-closest-approach-to-earth-on-friday

  3. Q3 Current Events & Technology

    India's target of nuclear power capacity by 2047, cited in the context of the SHANTI Act (December 2025), is:

    1. A100 GW
    2. B22 GW
    3. C50 GW
    4. D500 GW
    Show answerHide answer

    Answer A. 100 GW

    India aims to reach 100 GW of nuclear capacity by 2047 using large reactors and small modular reactors; the SHANTI Act enables private participation towards this goal.

    Source: https://world-nuclear-news.org/articles/indias-shanti-bill-completes-legislative-process

  4. Q4 Current Events & Technology

    Match the following:

    (a) DWG (b) DXF (c) IFC (d) SHP

    (i) Open, neutral data format for exchanging BIM models

    (ii) Native drawing file of AutoCAD

    (iii) Vector data format used in GIS (Esri shapefile)

    (iv) Drawing Exchange Format for transferring CAD data between programs

    1. A(a)-(iv), (b)-(ii), (c)-(i), (d)-(iii)
    2. B(a)-(ii), (b)-(iv), (c)-(iii), (d)-(i)
    3. C(a)-(ii), (b)-(iv), (c)-(i), (d)-(iii)
    4. D(a)-(ii), (b)-(i), (c)-(iv), (d)-(iii)
    Show answerHide answer

    Answer C. (a)-(ii), (b)-(iv), (c)-(i), (d)-(iii)

    DWG is AutoCAD's native format, DXF is Autodesk's Drawing Exchange Format for interoperability, IFC (Industry Foundation Classes, buildingSMART) is the open BIM exchange schema and SHP is the Esri shapefile used for GIS vector data.

    Source: CAD/BIM/GIS file formats (Autodesk; buildingSMART IFC; Esri)

  5. Q5 Current Events & Technology

    Justice Surya Kant, sworn in on 24 November 2025, is which Chief Justice of India?

    1. A53rd
    2. B54th
    3. C52nd
    4. D51st
    Show answerHide answer

    Answer A. 53rd

    Justice Surya Kant took oath as the 53rd CJI on 24 November 2025, succeeding Justice B.R. Gavai; he is the first CJI from Haryana, with tenure till February 2027.

    Source: https://www.businesstoday.in/india/story/justice-surya-kant-sworn-in-as-the-53rd-chief-justice-of-india-503369-2025-11-24

  6. Q6 Current Events & Technology

    After South Africa's 2025 presidency, which country holds the G20 presidency in 2026?

    1. ABrazil
    2. BIndia
    3. CUnited Kingdom
    4. DUnited States
    Show answerHide answer

    Answer D. United States

    Following the Johannesburg summit (Nov 2025), the rotating G20 presidency passed to the United States for 2026 (CBS News).

    Source: https://www.cbsnews.com/news/g20-summit-south-africa-declaration-us-boycott

  7. Q7 Urbanisation, Schemes & Missions

    AMRUT 2.0, launched on 1 October 2021, aims at:

    1. AMetro connectivity in million-plus cities
    2. BOnly rejuvenation of water bodies in 100 cities
    3. CUniversal coverage of sewerage in all statutory towns
    4. DUniversal coverage of water supply in all statutory towns and of sewerage/septage management in the 500 AMRUT cities
    Show answerHide answer

    Answer D. Universal coverage of water supply in all statutory towns and of sewerage/septage management in the 500 AMRUT cities

    AMRUT 2.0 (2021-26, outlay about Rs 2.77 lakh crore) targets functional tap connections in all ~4,800 statutory towns and 100% sewerage/septage coverage in the 500 AMRUT cities, along with Pey Jal Survekshan and City Water Balance Plans.

    Source: AMRUT 2.0 Operational Guidelines, MoHUA 2021

  8. Q8 Urbanisation, Schemes & Missions

    Each Smart City under the Mission is implemented by a Special Purpose Vehicle which is:

    1. AA limited company incorporated under the Companies Act, 2013 with State/UT and ULB as equal promoters (50:50)
    2. BA trust under the Indian Trusts Act, 1882
    3. CA society registered under the Societies Registration Act, 1860
    4. DA statutory authority under the MRTP Act
    Show answerHide answer

    Answer A. A limited company incorporated under the Companies Act, 2013 with State/UT and ULB as equal promoters (50:50)

    The SPV is a limited company under the Companies Act 2013 promoted by the State/UT and the ULB with 50:50 equity (private shareholding permitted provided State and ULB together retain majority), headed by a full-time CEO.

    Source: Smart Cities Mission Guidelines 2015, para 10 (SPV)

  9. Q9 Urbanisation, Schemes & Missions

    The URDPFI Guidelines 2014 recommend a per-capita provision of organised open space (parks, playgrounds etc.) in urban areas of about:

    1. A50 sq m per person
    2. B10-12 sq m per person
    3. C25-30 sq m per person
    4. D2-3 sq m per person
    Show answerHide answer

    Answer B. 10-12 sq m per person

    URDPFI suggests 10-12 sq m per person of organised open space (hierarchy from housing-cluster tot-lots to city parks), while the water supply norm is 135 lpcd.

    Source: URDPFI Guidelines 2014, Vol. I, Chapter 8 (planning norms)

  10. Q10 Urbanisation, Schemes & Missions

    Under the RERA Act, 2016 as implemented by MahaRERA:

    (i) 70% of amounts realised from allottees must be deposited in a separate bank account to cover construction and land cost

    (ii) The promoter is liable for structural defects for five years from handing over possession

    (iii) The remaining (operative) provisions of the Act, including mandatory registration of projects with the Authority, came into force on 1 May 2017

    Which are correct?

    1. A(i) and (ii) only
    2. B(ii) and (iii) only
    3. C(i) and (iii) only
    4. D(i), (ii) and (iii)
    Show answerHide answer

    Answer D. (i), (ii) and (iii)

    Section 4(2)(l)(D) requires 70% of receipts in a separate account; s.14(3) gives a five-year defect liability; ss.3-19 and the remaining operative provisions were notified to commence on 1 May 2017 (MahaRERA itself was constituted by the State Government in March 2017).

    Source: RERA Act 2016, ss.3, 4(2)(l)(D), 14(3), 20; MoHUA commencement notification (1 May 2017)

  11. Q11 Urbanisation, Schemes & Missions

    Which of the following was NOT a thrust area of AMRUT (2015)?

    1. ANon-motorised urban transport
    2. BWater supply
    3. CStorm water drainage
    4. DSolid waste management
    Show answerHide answer

    Answer D. Solid waste management

    AMRUT's thrust areas were water supply, sewerage and septage management, storm water drainage, green spaces and parks, and non-motorised urban transport; solid waste management is covered under SBM-U.

    Source: AMRUT Mission Statement and Guidelines, MoUD 2015, para 3

  12. Q12 Urbanisation, Schemes & Missions

    As per Census 2011, the level of urbanisation in India (share of urban population) and in Maharashtra were approximately:

    1. A25.7% and 38.0%
    2. B27.8% and 42.4%
    3. C31.2% and 45.2%
    4. D35.0% and 50.1%
    Show answerHide answer

    Answer C. 31.2% and 45.2%

    Census 2011 recorded 377 million urban population, 31.16% of India's total (up from 27.8% in 2001); Maharashtra's urban share was 45.2%, among the highest of the large States.

    Source: Census of India 2011, Provisional Population Totals (Urban)

  13. Q13 Policies in India & Maharashtra

    The National Urban Housing and Habitat Policy, 2007 provides that in every new public/private housing project, the reservation for EWS/LIG housing shall be:

    1. A10-15% of land or 20-25% of FAR/FSI, whichever is greater
    2. B5-10% of land or 10-15% of FAR/FSI, whichever is less
    3. C20-25% of land or 10-15% of FAR/FSI, whichever is greater
    4. D15-20% of land or 25-30% of FAR/FSI, whichever is less
    Show answerHide answer

    Answer A. 10-15% of land or 20-25% of FAR/FSI, whichever is greater

    The policy's action plan reserves 10 to 15 percent of land or 20 to 25 percent of FAR/FSI, whichever is greater, for EWS/LIG housing, with State legislation and FAR relaxation to support it.

    Source: NUHHP 2007, Action Plan - Land / Spatial incentives

  14. Q14 Policies in India & Maharashtra

    The stated overarching goal of the National Urban Housing and Habitat Policy, 2007 is:

    1. ARental housing for all migrant industrial workers only
    2. BOwnership housing for all government employees only
    3. CAffordable housing for all, especially vulnerable sections
    4. DSlum-free cities through clearance of all informal settlements
    Show answerHide answer

    Answer C. Affordable housing for all, especially vulnerable sections

    NUHHP 2007 aims at 'Affordable Housing for All' with emphasis on SC/ST/BC, minorities, the urban poor and other vulnerable groups, through sustainable habitat development and a regional planning approach.

    Source: NUHHP 2007, Preamble and Aims

  15. Q15 RTI & RTS Acts

    Regarding the Maharashtra State Commission for Right to Public Services constituted under section 13, which statement is INCORRECT?

    1. AThe Chief Commissioner must be a retired Judge of the High Court
    2. BThe Chief Commissioner and Commissioners are appointed by the Governor on the recommendation of a committee headed by the Chief Minister
    3. CThe selection committee includes the Leader of Opposition in the Legislative Assembly and a Cabinet Minister nominated by the Chief Minister
    4. DThe Commission consists of a State Chief Commissioner and State Commissioners, one for each revenue division
    Show answerHide answer

    Answer A. The Chief Commissioner must be a retired Judge of the High Court

    Section 13 provides for a State Chief Commissioner (with jurisdiction over Mumbai City and Suburban districts) and a State Commissioner for each revenue division, appointed on the recommendation of a committee of the Chief Minister, the Leader of Opposition and a nominated Cabinet Minister; s.13(5) only requires persons of eminence in public life with wide administrative experience, not a judicial qualification.

    Source: Maharashtra Right to Public Services Act 2015, s.13(2)-(5)

  16. Q16 RTI & RTS Acts

    In any appeal proceedings under the RTI Act, the onus to prove that a denial of a request was justified lies on:

    1. AThe appellant
    2. BThe Information Commission
    3. CThe third party
    4. DThe Public Information Officer who denied the request
    Show answerHide answer

    Answer D. The Public Information Officer who denied the request

    Section 19(5) provides that in any appeal proceedings, the onus to prove that a denial of a request was justified shall be on the Central/State Public Information Officer who denied the request.

    Source: RTI Act 2005, s.19(5)

  17. Q17 RTI & RTS Acts

    A PIO, without reasonable cause, furnished information 150 days after the expiry of the statutory period. The maximum penalty the Information Commission can impose on the PIO under section 20(1) of the RTI Act is:

    1. ARs 25,000
    2. BRs 37,500
    3. CRs 50,000
    4. DRs 15,000
    Show answerHide answer

    Answer A. Rs 25,000

    Section 20(1) prescribes a penalty of Rs 250 per day till information is furnished, subject to a ceiling of Rs 25,000. 150 x 250 = Rs 37,500, which exceeds the ceiling, so the maximum penalty is Rs 25,000.

    Source: RTI Act 2005, s.20(1)

  18. Q18 Theories of Planning

    In central place theory, the minimum population or purchasing power required to support the supply of a good or service from a central place is called its:

    1. AHinterland
    2. BHierarchy
    3. CRange
    4. DThreshold
    Show answerHide answer

    Answer D. Threshold

    Threshold is the minimum demand needed for a function to be viable, whereas range is the maximum distance consumers will travel to obtain the good. The range must exceed the threshold for a function to exist.

    Source: Christaller, central place theory concepts

  19. Q19 Theories of Planning

    The concept of 'Ecumenopolis', a continuous world-wide city of the future, and the term 'Dynapolis' are associated with:

    1. ALe Corbusier
    2. BKevin Lynch
    3. CC.A. Doxiadis
    4. DLewis Mumford
    Show answerHide answer

    Answer C. C.A. Doxiadis

    Doxiadis, the Greek planner of Islamabad, coined Ekistics, proposed the dynamically growing city 'Dynapolis' and the ultimate global settlement 'Ecumenopolis'.

    Source: Doxiadis, Ekistics

  20. Q20 Theories of Planning

    A typical residential sector in Le Corbusier's plan for Chandigarh measures about:

    1. A1,600 m x 2,400 m
    2. B400 m x 600 m
    3. C1,000 m x 1,000 m
    4. D800 m x 1,200 m
    Show answerHide answer

    Answer D. 800 m x 1,200 m

    Chandigarh's sectors are 800 m by 1,200 m self-contained neighbourhood units bounded by V3 roads, housing roughly 5,000 to 25,000 people with shopping on a V4 street. Gandhinagar's sectors are 1 km x 1 km.

    Source: Le Corbusier, Chandigarh Master Plan (1951)

  21. Q21 Theories of Planning

    If a region's largest city has a population of 20 lakh and the rank-size rule holds exactly, the population of the fourth-ranked city will be:

    1. A2.5 lakh
    2. B10 lakh
    3. C5 lakh
    4. D4 lakh
    Show answerHide answer

    Answer C. 5 lakh

    Rank-size rule (Zipf): P(r) = P1 / r. For r = 4, P = 20 lakh / 4 = 5 lakh.

    Source: Zipf's rank-size rule

  22. Q22 Regional Plan

    Under the MRTP Act, 1966, a Region is established by the State Government by:

    1. ANotification by the Collector (s.18)
    2. BOrder of the Director of Town Planning (s.13)
    3. CResolution of the Regional Planning Board (s.4)
    4. DNotification in the Official Gazette defining its limits (s.3)
    Show answerHide answer

    Answer D. Notification in the Official Gazette defining its limits (s.3)

    Section 3(1) empowers the State Government, by notification in the Official Gazette, to establish any area in the State by defining its limits to be a Region for the purposes of the Act and to name it.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.3(1)

  23. Q23 Regional Plan

    A region's population grows geometrically at 25% per decade. If the population is 5,00,000 in 2011, the projected population in 2031 is approximately:

    1. A7,50,000
    2. B7,81,250
    3. C8,25,000
    4. D7,00,000
    Show answerHide answer

    Answer B. 7,81,250

    Geometric method: P = P0 (1 + r)^n = 5,00,000 x 1.25 x 1.25 = 5,00,000 x 1.5625 = 7,81,250.

    Source: Population projection: geometric increase method

  24. Q24 Regional Plan

    After considering the report of the Regional Planning Committee, the Regional Board under section 16(4) of the MRTP Act submits the Regional plan with modifications to the:

    1. AMetropolitan Planning Committee
    2. BState Government, along with the Committee's report and connected documents
    3. CDirector of Town Planning for sanction
    4. DCollector for publication
    Show answerHide answer

    Answer B. State Government, along with the Committee's report and connected documents

    Section 16(4) requires the Board to prepare the Regional plan with such modifications as it thinks fit and submit it to the State Government together with the report of the Regional Planning Committee and all connected documents, maps and plans.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.16(4)

  25. Q25 Development Plan

    Under section 28(4) of the MRTP Act, after receiving the Planning Committee's report, the Planning Authority must make and carry out modifications to the draft DP and publish the list of modifications within two months, in the Official Gazette and in:

    1. AAt least one national newspaper
    2. BNot less than two local newspapers
    3. CThe Regional Board's bulletin only
    4. DNot less than three local newspapers
    Show answerHide answer

    Answer B. Not less than two local newspapers

    Section 28(4) requires the list of modifications to be published, within two months of the report, in the Official Gazette and in not less than two local newspapers for public information.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.28(4)

  26. 75 questions to go. Take the rest with a timer and see your score.

    Start free
  27. Q26 Development Plan

    URDPFI Guidelines 2014 suggest one primary school per 5,000 population. For a projected population of 1,50,000, the number of primary schools to be provided in the DP is:

    1. A30
    2. B15
    3. C300
    4. D50
    Show answerHide answer

    Answer A. 30

    Number of schools = 1,50,000 / 5,000 = 30.

    Source: URDPFI Guidelines 2014, Vol I, Ch. 7 (social infrastructure norms: primary school 1 per 5,000)

  28. Q27 Development Plan

    Consider the following statements about the British structure-plan system introduced in 1968:

    (i) Structure plans were prepared by county planning authorities and approved by the Secretary of State.

    (ii) Local plans were required to be in general conformity with the structure plan.

    (iii) Structure plans were prepared on an Ordnance Survey base map showing individual plot boundaries.

    Which of the above are correct?

    1. A(i) and (ii) only
    2. B(i), (ii) and (iii)
    3. C(ii) and (iii) only
    4. D(i) and (iii) only
    Show answerHide answer

    Answer A. (i) and (ii) only

    Structure plans were strategic county-level documents approved centrally, and local plans had to conform with them. Showing plot boundaries was the job of local plans; structure plans used a key diagram.

    Source: Town and Country Planning Act 1968 (UK); Local Government Act 1972

  29. Q28 Development Plan

    Under section 43 of the MRTP Act, development within the area of a Planning Authority needs its written permission after which event?

    1. APublication of the declaration of intention to prepare a DP under section 23
    2. BSanction of the final DP under section 31
    3. CSubmission of the draft DP under section 30
    4. DPublication of the draft DP under section 26
    Show answerHide answer

    Answer A. Publication of the declaration of intention to prepare a DP under section 23

    Section 43 applies the requirement for permission from the date the declaration of intention to prepare a DP is published, so that development cannot get ahead of the plan while it is being prepared.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.43

  30. Q29 Development Plan

    Under section 43 of the MRTP Act, which of the following does NOT require permission of the Planning Authority?

    1. AConstruction of a commercial complex on agricultural land
    2. BChange of use of a residential building to an office
    3. CExcavation, including wells, made in the ordinary course of agricultural operations
    4. DSubdivision of land into residential plots
    Show answerHide answer

    Answer C. Excavation, including wells, made in the ordinary course of agricultural operations

    The proviso to s.43 exempts excavations, including wells, made in the ordinary course of agricultural operations. The other activities are 'development' under s.2(7) and need permission.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.43 proviso (v)

  31. Q30 Development Plan

    A Development Plan projects a population of 5,00,000 for the plan horizon year. If the planned gross density is 125 persons per hectare, the total developable area needed is:

    1. A6,250 ha
    2. B4,000 ha
    3. C400 ha
    4. D40,000 ha
    Show answerHide answer

    Answer B. 4,000 ha

    Area = population / density = 5,00,000 / 125 = 4,000 ha.

    Source: Land requirement = projected population / gross density (URDPFI 2014)

  32. Q31 Development Plan

    Under section 24 of the MRTP Act, the Planning Authority appoints a Town Planning Officer to carry out the survey and prepare the DP proposals:

    1. AAfter publication of the draft DP, with the sanction of the Director of Town Planning
    2. BAt the time of submitting the DP under section 30, with the sanction of the Collector
    3. CAfter sanction of the DP, without needing anyone's sanction
    4. DAt the time of declaring its intention to prepare the DP, with the sanction of the State Government
    Show answerHide answer

    Answer D. At the time of declaring its intention to prepare the DP, with the sanction of the State Government

    Section 24 requires the Planning Authority, at the time of the declaration of intention, to resolve to appoint a qualified person as Town Planning Officer. The appointment needs the sanction of the State Government.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.24

  33. Q32 Development Plan

    Under the URDPFI Guidelines 2014, a city with a population of 70 lakh is classified as a:

    1. ALarge City
    2. BMetropolitan City I
    3. CMetropolitan City II
    4. DMegapolis
    Show answerHide answer

    Answer C. Metropolitan City II

    Metropolitan City I covers 10-50 lakh, Metropolitan City II covers 50 lakh to 1 crore, and a Megapolis has more than 1 crore people. So 70 lakh is Metropolitan City II.

    Source: URDPFI Guidelines 2014, Vol. I, Ch. 2

  34. Q33 Development Plan

    Match the provision of the MRTP Act with its time limit:

    (a) Preparing the ELU map after declaration (s.25) (b) Publishing the draft DP after the s.23 notice (s.26) (c) Submitting the draft DP after publication (s.30) (d) Revising the DP after it comes into operation (s.38)

    (i) Two years (ii) Twelve months (iii) Twenty years (iv) Six months, with extension of up to one year in aggregate

    1. Aa-ii, b-i, c-iv, d-iii
    2. Ba-iv, b-i, c-ii, d-iii
    3. Ca-i, b-iv, c-ii, d-iii
    4. Da-iv, b-ii, c-i, d-iii
    Show answerHide answer

    Answer B. a-iv, b-i, c-ii, d-iii

    Section 25: six months, extendable by up to one year in aggregate. Section 26(1): two years from the s.23 notice. Section 30(1): twelve months from the s.26 notice (six months before Mah. 29 of 2024, w.e.f. 23 March 2020). Section 38: at least once in twenty years.

    Source: MRTP Act 1966 (as on 28 Jul 2026), ss.25, 26(1), 30(1), 38

  35. Q34 Development Plan

    Under section 31(6) of the MRTP Act, a Development Plan that has come into operation is called the:

    1. AFinal Development Plan
    2. BRegional Plan
    3. CInterim Development Plan
    4. DDraft Development Plan
    Show answerHide answer

    Answer A. Final Development Plan

    Section 31(6) names a DP that has come into operation the 'final Development plan' and makes it binding on the Planning Authority.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.31(6)

  36. Q35 Town Planning Scheme

    Under section 68(1) of the MRTP Act (as amended), the Planning Authority must submit the draft scheme, with modifications and copies of objections, to the State Government within ____ from publication of the notice in the Official Gazette.

    1. Asix months
    2. Bone month
    3. Ctwelve months
    4. Dthree months
    Show answerHide answer

    Answer D. three months

    s.68(1) requires submission of the draft scheme for sanction within three months (six months before Mah. 35 of 2014) from publication of the notice in the Official Gazette.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.68(1)

  37. Q36 Town Planning Scheme

    Under section 88(b) of the MRTP Act, on the preliminary scheme coming into force, the rights in the original plots that have been reconstituted:

    1. AVest in the State Government
    2. BDetermine, and the reconstituted plots become subject to the rights settled by the Arbitrator
    3. CContinue unchanged until the final scheme is sanctioned
    4. DAre transferred to the Tribunal of Appeal for adjudication
    Show answerHide answer

    Answer B. Determine, and the reconstituted plots become subject to the rights settled by the Arbitrator

    s.88(b) ends all rights in reconstituted original plots and makes the reconstituted plots subject to the rights settled by the Arbitrator, so title passes from OP to FP.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.88(b)

  38. Q37 Town Planning Scheme

    Under section 85(2) of the MRTP Act, at the request of a person whose land was taken in advance, the Planning Authority may, after consulting the Arbitrator, pay an advance as provided in:

    1. ASection 51(2)
    2. BSection 129(3)
    3. CSection 97(1)
    4. DSection 126(1)
    Show answerHide answer

    Answer B. Section 129(3)

    Section 85(2) allows an advance payment, after consulting the Arbitrator, as provided in s.129(3), which (in the section on possession of land in case of urgency) permits an advance not exceeding two-thirds of the estimated amount after an agreement under s.157.

    Source: MRTP Act 1966 (as on 28 Jul 2026), ss.85(2), 129(3)

  39. Q38 Town Planning Scheme

    For the proviso to section 72(7) of the MRTP Act, a 'substantial variation' in the draft scheme by the Arbitrator means an increase in the total cost of the draft scheme of more than:

    1. A20 per cent or two crore rupees, whichever is higher
    2. B20 per cent or two crore rupees, whichever is lower
    3. C10 per cent or one lakh rupees, whichever is lower
    4. D25 per cent or five lakh rupees, whichever is higher
    Show answerHide answer

    Answer A. 20 per cent or two crore rupees, whichever is higher

    The Explanation to s.72(7) defines 'substantial variation' as an increase in the total cost of the draft scheme of more than 20% or Rs. 2 crore, whichever is higher (Rs. 2 lakh before Mah. 44 of 2025), on account of new works or additional public-purpose sites. Such variations need prior State sanction after hearing the Planning Authority and objecting owners (proviso (b)).

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.72(7), Explanation

  40. Q39 Town Planning Scheme

    For a TPS: works to be executed Rs. 3 crore; legal expenses Rs. 10 lakh; compensation for reservations solely beneficial to scheme residents Rs. 50 lakh; compensation for a reservation partly beneficial (50% attributable to scheme residents) Rs. 40 lakh; cost of infrastructure in the adjacent area Rs. 1 crore. Ignoring s.97(1)(f), the cost of scheme under section 97 is:

    1. ARs. 4.2 crore
    2. BRs. 4.0 crore
    3. CRs. 3.8 crore
    4. DRs. 4.5 crore
    Show answerHide answer

    Answer B. Rs. 4.0 crore

    Cost = 300 + 10 + 50 + (50% x 40 = 20) + (20% x 100 = 20) = 400 lakh = Rs. 4.0 crore (s.97(1)(b)-(e),(g)).

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.97(1)

  41. Q40 Town Planning Scheme

    Under section 40(3)(jj)(a) of the GTPUDA, 1976, match the purpose with the share of the total scheme area that may be allotted:

    A. Roads - 1. 5 per cent

    B. Parks, playgrounds, gardens and open space - 2. 15 per cent

    C. Sale by appropriate authority for residential, commercial or industrial use - 3. 5 per cent

    D. Social infrastructure (school, dispensary, fire brigade, public utility) - 4. 15 per cent

    1. AA-1, B-2, C-4, D-3
    2. BA-2, B-1, C-4, D-3
    3. CA-4, B-3, C-2, D-1
    4. DA-2, B-4, C-1, D-3
    Show answerHide answer

    Answer B. A-2, B-1, C-4, D-3

    s.40(3)(jj)(a) allots 15% for roads, 5% for open spaces, 5% for social infrastructure and 15% for sale, 40% in all, comparable to the 40% aggregate in MRTP s.64(g-1)(ii).

    Source: GTPUDA 1976, s.40(3)(jj)

  42. Q41 Town Planning Scheme

    Under section 64(g-1)(i) of the MRTP Act, the draft scheme reserves ____ of the total scheme area for housing for economically weaker sections, lower income groups and persons dispossessed in the scheme.

    1. A10 per cent
    2. B5 per cent
    3. C15 per cent
    4. D20 per cent
    Show answerHide answer

    Answer A. 10 per cent

    s.64(g-1)(i) provides for reserving land to the extent of ten per cent of the total scheme area for EWS/LIG housing and for persons dispossessed in the scheme.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.64(g-1)(i)

  43. Q42 Town Planning Scheme

    Under section 72(3) of the MRTP Act, the Arbitrator must, as far as possible, prepare the final scheme within ____ from the date of his appointment.

    1. Atwelve months
    2. Bthirty-six months
    3. Ctwenty-four months
    4. Deighteen months
    Show answerHide answer

    Answer D. eighteen months

    s.72(3) sets nine months for the preliminary scheme and, as far as possible, eighteen months for the final scheme, both counted from the Arbitrator's appointment.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.72(3)

  44. Q43 Local Area Plan

    A Local Area Plan (LAP) is best described as:

    1. AA detailed plan for a part of a city, such as a ward, precinct or corridor, that elaborates the Development Plan, typically for regeneration of built-up areas
    2. BA long-term perspective plan for the whole State
    3. CA plan for a group of districts prepared by a Regional Planning Board
    4. DA building-level plan submitted for development permission
    Show answerHide answer

    Answer A. A detailed plan for a part of a city, such as a ward, precinct or corridor, that elaborates the Development Plan, typically for regeneration of built-up areas

    An LAP works below the city-level DP and details land use, circulation, infrastructure and urban form for a smaller area, mainly to regenerate already developed areas (URDPFI 2014; GTPUDA s.76A).

    Source: URDPFI Guidelines 2014 (plan hierarchy); GTPUDA 1976, s.76A

  45. Q44 Local Area Plan

    Section 23(1)(ix-a) of the GTPUDA, 1976 empowers the urban development authority to:

    1. ALevy and collect fees or charges for execution of works and provision of amenities specified in the Local Area Plan
    2. BAcquire land under the RFCTLARR Act for the Local Area Plan
    3. CAppoint a Town Planning Officer for the Local Area Plan
    4. DSuspend the Development Plan in the Local Area Plan area
    Show answerHide answer

    Answer A. Levy and collect fees or charges for execution of works and provision of amenities specified in the Local Area Plan

    s.23(1)(ix-a) lets the authority levy and collect fees or charges for works, services and amenities specified in the LAP, so LAP infrastructure can be recovered from beneficiaries.

    Source: GTPUDA 1976, s.23(1)(ix-a)

  46. Q45 Local Area Plan

    Which of the following is NOT a typical component of a Local Area Plan?

    1. ADetailed street network and road widening proposals
    2. BPlot-level development controls and urban design guidelines
    3. CUpgrading of local physical and social infrastructure
    4. DRegional settlement hierarchy and inter-district transport corridors
    Show answerHide answer

    Answer D. Regional settlement hierarchy and inter-district transport corridors

    LAPs work at neighbourhood or precinct scale (streets, plot-level controls, urban design, local infrastructure). Settlement hierarchy and inter-district corridors belong to a Regional Plan (MRTP s.14).

    Source: MRTP Act 1966 (as on 28 Jul 2026), ss.14, 33A(3); URDPFI Guidelines 2014

  47. Q46 UDCPR

    The extent of Foreign Direct Investment permitted in Integrated Township Projects in India (Press Note 4 of 2001 series) is:

    1. A74%
    2. B49%
    3. C100%
    4. D26%
    Show answerHide answer

    Answer C. 100%

    Press Note No. 4 (2001 series) of DIPP allowed 100% FDI in development of integrated townships, which the Maharashtra ITP regulation cites as one of the enabling incentives.

    Source: DIPP Press Note 4 (2001); UDCPR 2020, Regulation 14.1

  48. Q47 UDCPR

    Which of the following is counted in the P-line area for FSI under the UDCPR?

    1. ALift well and lift machine room
    2. BA double-height terrace
    3. CAn atrium
    4. DRefuge area of a high-rise building
    Show answerHide answer

    Answer B. A double-height terrace

    Reg 6.6 expressly includes double-height terraces in the P-line. Lift wells, lift machine rooms (6.8(iii)), refuge areas (6.8(v)) and atriums (6.8(vii)) are excluded from FSI.

    Source: UDCPR 2020 (as amended), Regs 6.6 and 6.8

  49. Q48 UDCPR

    In a Regional plan area, an Integrated Township Project under UDCPR 2020 may be permitted on land falling in the:

    1. AAny land-use zone, including Agricultural / No-Development Zone, except excluded areas such as notified forests, water bodies, National Parks and defence estates
    2. BCoastal Regulation Zone only
    3. CReserved forest only
    4. DDefence land only
    Show answerHide answer

    Answer A. Any land-use zone, including Agricultural / No-Development Zone, except excluded areas such as notified forests, water bodies, National Parks and defence estates

    Reg 14.1.1.7(i)(a): an ITP may be permitted in any land-use zone of a sanctioned Regional / Development Plan, except the areas listed in Reg 14.1.1.2(v) (notified forest, water bodies, mangroves and area within HTL, National Parks, defence estates, cantonments, quarry zone, gaothan etc.); zones other than residential/commercial pay a premium under Table 14-A (10% for Agriculture/NDZ). Hill-top/hill-slope, flood-zone, ESZ-buffer and CRZ-buffer lands may be included up to 40% of the ITP area, with no construction on hill slopes (14.1.1.2(ii)(g), 14.1.1.7(i)(c)).

    Source: UDCPR 2020, Reg 14.1.1.7(i), Table 14-A; Reg 14.1.1.2(ii)(g), (v)

  50. Q49 UDCPR

    Under UDCPR 2020, the quantum of TDR that can be loaded on a receiving plot is primarily limited by:

    1. Athe number of floors in the existing building
    2. Bthe area of the generating plot
    3. Cthe population of the ward
    4. Dthe TDR column of Table 6-G/6-A, which depends on the width of the road the plot fronts
    Show answerHide answer

    Answer D. the TDR column of Table 6-G/6-A, which depends on the width of the road the plot fronts

    TDR loading is capped by the road-width-based limits in Table 6-G (0.40 to 1.40 in MC non-congested areas) and Table 6-A, along with other conditions in Reg 6.3 and Chapter 11.

    Source: UDCPR 2020, Reg 6.3, Table 6-G; Chapter 11

  51. Q50 UDCPR

    Under UDCPR 2020, development charges under the MRTP Act are to be deposited:

    1. Aafter completion of plinth, at the Collector's rates
    2. Bbefore issue of development permission/commencement certificate, calculated using the rates in the Annual Statement of Rates (ASR)
    3. Cat the time of occupancy certificate, at a flat rate
    4. Donly for buildings above 24 m height
    Show answerHide answer

    Answer B. before issue of development permission/commencement certificate, calculated using the rates in the Annual Statement of Rates (ASR)

    Reg 2.2.13 requires development charges to be deposited before issue of DP/CC, calculated for each land parcel considering ASR rates; compound walls, maintenance and certain repairs are exempt.

    Source: UDCPR 2020, Reg 2.2.13; MRTP Act 1966 (as on 28 Jul 2026), ss.124A, 124B

  52. 50 questions to go. Take the rest with a timer and see your score.

    Start free
  53. Q51 UDCPR

    For Municipal Councils and Regional Plan areas, relaxations under Reg 2.4 of UDCPR 2020 are to be granted in consultation with the:

    1. ADirector of Municipal Administration
    2. BChief Fire Officer
    3. CCollector
    4. Dconcerned Divisional Joint Director of Town Planning
    Show answerHide answer

    Answer D. concerned Divisional Joint Director of Town Planning

    Reg 2.4 provides that in Municipal Councils and RP areas such relaxation shall be granted in consultation with the concerned Divisional Joint Director of Town Planning.

    Source: UDCPR 2020, Reg 2.4

  54. Q52 UDCPR

    A composite building has proposed FSI of 3,000 sq m for residential use and 1,000 sq m for commercial use. Taking ancillary area FSI on a pro-rata basis by use, the maximum ancillary area FSI is:

    1. A2,400 sq m
    2. B2,600 sq m
    3. C3,200 sq m
    4. D2,000 sq m
    Show answerHide answer

    Answer B. 2,600 sq m

    For mixed uses, ancillary FSI is pro-rata: residential 60% x 3,000 = 1,800 sq m; commercial 80% x 1,000 = 800 sq m. Total = 2,600 sq m.

    Source: UDCPR 2020 (as amended), Notes 1 and 4 below Table 6-A; Note (i) below Table 6-G

  55. Q53 UDCPR

    Under the proviso to UDCPR Reg 7.10(i), which buildings must mandatorily achieve at least GRIHA Three star / IGBC Silver / LEED Silver (or equivalent)?

    1. AAll buildings on plots above 4,000 sq m, whether public or private
    2. BBuildings of Government, Semi-Government, local bodies and public sector undertakings
    3. CAll IT/ITES buildings and data centres in Municipal Corporation areas
    4. DAll residential and commercial buildings above 24 m height in any authority
    Show answerHide answer

    Answer B. Buildings of Government, Semi-Government, local bodies and public sector undertakings

    The proviso makes a minimum three-star/silver-equivalent rating compulsory for all Government, Semi-Government, local body and PSU construction projects. For private projects the rating is voluntary and rewarded with incentive FSI.

    Source: UDCPR 2020 (as amended), Reg 7.10(i) proviso

  56. Q54 UDCPR

    An owner surrenders 800 sq.m. of land affected by a DP road (non-congested area) free of cost to the Planning Authority. The TDR admissible under UDCPR 2020 is:

    1. A800 sq.m.
    2. B2,400 sq.m.
    3. C1,200 sq.m.
    4. D1,600 sq.m.
    Show answerHide answer

    Answer D. 1,600 sq.m.

    Reg 11.2.4: TDR equal to 2 times the area of land surrendered (non-congested area). 2 x 800 = 1,600 sq.m.

    Source: UDCPR 2020, Reg 11.2.4

  57. Q55 UDCPR

    Under UDCPR 2020, 'row housing' means a row of houses with:

    1. Aonly front open space
    2. Bonly front and rear open spaces, except end houses which have side open spaces
    3. Ccommon walls on all sides and a central courtyard
    4. Dopen spaces on all four sides
    Show answerHide answer

    Answer B. only front and rear open spaces, except end houses which have side open spaces

    Reg 1.3 defines row housing as a row of houses with only front and rear open spaces, except end houses which shall have side open spaces.

    Source: UDCPR 2020, Reg 1.3 (definition: Row housing)

  58. Q56 UDCPR

    A residential building is proposed with 4,000 sq.m. of FSI (basic + premium + TDR) in a Municipal Corporation. The maximum ancillary area FSI that can be added under UDCPR 2020, and the resulting total built-up area, are:

    1. A1,600 sq.m.; 5,600 sq.m.
    2. B2,000 sq.m.; 6,000 sq.m.
    3. C2,400 sq.m.; 6,400 sq.m.
    4. D3,200 sq.m.; 7,200 sq.m.
    Show answerHide answer

    Answer C. 2,400 sq.m.; 6,400 sq.m.

    Ancillary area FSI for residential = 60% of proposed FSI = 0.60 x 4,000 = 2,400 sq.m.; total = 4,000 + 2,400 = 6,400 sq.m.

    Source: UDCPR 2020, Reg 6.1 & 6.3

  59. Q57 UDCPR

    In UDCPR 2020, a 'tenement' is defined as:

    1. Aa dwelling unit having carpet area not exceeding 30 sq.m.
    2. Ban independent dwelling unit with a kitchen or cooking alcove
    3. Cany room let out on rent in a building
    4. Da unit in a group housing scheme having a separate entrance staircase
    Show answerHide answer

    Answer B. an independent dwelling unit with a kitchen or cooking alcove

    Reg 1.3 defines tenement as 'an independent dwelling unit with a kitchen or cooking alcove'; size limits arise only under specific schemes (e.g. inclusive housing).

    Source: UDCPR 2020, Reg 1.3 (definition: Tenement)

  60. Q58 Development Charges & Appeal

    Under section 47 of the MRTP Act, an appeal against a refusal or conditional grant of permission lies to the State Government or to an officer appointed by it not below the rank of:

    1. AJoint Director of Town Planning
    2. BUnder Secretary to Government
    3. CDeputy Secretary to Government
    4. DDivisional Commissioner
    Show answerHide answer

    Answer C. Deputy Secretary to Government

    Section 47 allows an appeal within forty days of communication of the order, to the State Government or an officer not below the rank of Deputy Secretary to Government.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.47(1)

  61. Q59 Development Charges & Appeal

    A residential building with a built-up area of 3,000 sq m is proposed. The ASR rate of developed land is Rs.20,000 per sq m. Taking a building development charge rate of 2% of the ASR rate, the development charge is:

    1. ARs.1,20,000
    2. BRs.12,00,000
    3. CRs.3,00,000
    4. DRs.6,00,000
    Show answerHide answer

    Answer B. Rs.12,00,000

    Development charge = built-up area x ASR rate x 2% = 3,000 x 20,000 x 0.02 = Rs.12,00,000.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.124B(2) with Second Schedule, Part I (rate assumed in question)

  62. Q60 Development Charges & Appeal

    With reference to development charge regulations under the MRTP Act, consider:

    (i) Before changing the rates, the Authority must pass a resolution at a special meeting and obtain the State Government's sanction to the regulations.

    (ii) The charge comes into force on or after the date specified by the State Government in its sanction (s.124C).

    (iii) Every later enhancement or reduction of rates must be separately notified to each affected owner or occupier (s.124D).

    Which is/are correct?

    1. A(i), (ii) and (iii)
    2. B(i) and (iii) only
    3. C(i) and (ii) only
    4. D(ii) and (iii) only
    Show answerHide answer

    Answer C. (i) and (ii) only

    s.124B needs a special-meeting resolution and State sanction, and s.124C brings the charge into force from the date the State specifies. s.124D(1) needs display on the office notice board and a notice in a local newspaper, but s.124D(2) says no separate notice to owners or occupiers is needed when rates are enhanced or reduced.

    Source: MRTP Act 1966 (as on 28 Jul 2026), ss.124B(3), 124C, 124D

  63. Q61 Development Charges & Appeal

    Consider the following about sections 124K and 124L of the MRTP Act:

    (i) A person who continues development after a stop notice for non-payment of development charge may be imprisoned for not less than three months, up to three years.

    (ii) If the person fails to demolish as required, the Authority may demolish and recover the expense as arrears of land revenue.

    (iii) The development charge Chapter has effect notwithstanding anything inconsistent in the MRTP Act or any other law.

    Which are correct?

    1. A(i), (ii) and (iii)
    2. B(ii) and (iii) only
    3. C(iii) only
    4. D(i) and (ii) only
    Show answerHide answer

    Answer A. (i), (ii) and (iii)

    s.124K(3) prescribes imprisonment of 3 months to 3 years, a fine of Rs.1,000 to 5,000 and up to Rs.100 per day for continuing default. s.124K(4) allows demolition at the defaulter's cost. s.124L(1) gives the Chapter overriding effect.

    Source: MRTP Act 1966 (as on 28 Jul 2026), ss.124K(3),(4), 124L(1)

  64. Q62 Transportation

    A binary logit mode-choice model gives utilities of U(car) = -1.0 and U(bus) = -1.5 for a trip. The probability of choosing bus is about:

    1. A0.38
    2. B0.50
    3. C0.62
    4. D0.33
    Show answerHide answer

    Answer A. 0.38

    P(bus) = e^-1.5 / (e^-1.0 + e^-1.5) = 0.2231/(0.3679 + 0.2231) = 0.2231/0.5910 = 0.38 (and P(car) = 0.62).

    Source: Multinomial/binary logit model of mode choice

  65. Q63 Transportation

    The National Transit Oriented Development (TOD) Policy, 2017 defines the 'influence zone' around a transit station as the area within a walking distance of about:

    1. A100-200 m
    2. B2-3 km
    3. C5 km
    4. D500-800 m (5-10 minute walk)
    Show answerHide answer

    Answer D. 500-800 m (5-10 minute walk)

    The National TOD Policy (MoHUA, 2017) defines the TOD influence zone as the area within 500-800 m, i.e. a 5-10 minute walk, where high density mixed-use development is encouraged.

    Source: National Transit Oriented Development Policy 2017, MoHUA

  66. Q64 Transportation

    IRC:65-1976 recommends that a traffic rotary (roundabout) is suitable when the total traffic entering from all legs is in the range of:

    1. A50 to 300 vehicles per hour
    2. BAbove 10,000 vehicles per hour
    3. C500 to 3,000 vehicles per hour
    4. D3,000 to 10,000 vehicles per hour
    Show answerHide answer

    Answer C. 500 to 3,000 vehicles per hour

    IRC:65 considers a rotary suitable when total entering traffic is about 500-3,000 veh/h; below that a simple intersection suffices and above it signals or grade separation are required.

    Source: IRC:65-1976, Recommended practice for traffic rotaries

  67. Q65 Transportation

    Camber on a road is provided for drainage of surface water; as per IRC the recommended camber for a cement concrete surface in an area of heavy rainfall is:

    1. A4.0% (1 in 25)
    2. B1.0% (1 in 100)
    3. C2.0% (1 in 50)
    4. D3.0% (1 in 33)
    Show answerHide answer

    Answer C. 2.0% (1 in 50)

    IRC recommends camber of 2.0% (heavy rain) / 1.7% (light rain) for CC and high-type bituminous surfaces, 2.5-3.0% for WBM/gravel and 3-4% for earth roads; smoother surfaces need less camber.

    Source: IRC:73-1980 – Recommended values of camber

  68. Q66 Transportation

    In mode-choice analysis, 'captive riders' of public transport are those who:

    1. AMake all their trips by walking and never use any vehicle at all
    2. BOwn two or more cars but use the metro on weekends for leisure
    3. CHave no access to a personal vehicle and must use public transport
    4. DChoose public transport only when it is faster than driving a car
    Show answerHide answer

    Answer C. Have no access to a personal vehicle and must use public transport

    Captive users depend on public transport because they lack access to a personal vehicle; 'choice riders' can use either and switch based on time, cost and comfort.

    Source: Mode choice theory - captive vs choice riders

  69. Q67 Environment

    Which of the following measures help in mitigating the Urban Heat Island (UHI) effect?

    (i) Cool/reflective roofs with high albedo

    (ii) Increasing the proportion of dark asphalt surfaces

    (iii) Urban greening and green roofs

    (iv) Preserving urban water bodies

    1. A(i), (ii), (iii) and (iv)
    2. B(i) and (ii) only
    3. C(i), (iii) and (iv) only
    4. D(ii), (iii) and (iv) only
    Show answerHide answer

    Answer C. (i), (iii) and (iv) only

    UHI arises from low-albedo dark surfaces, reduced vegetation/evapotranspiration, urban canyon geometry and anthropogenic heat; high-albedo surfaces, vegetation and water bodies reduce it, whereas dark asphalt increases heat absorption.

    Source: Oke, T.R. – Urban climatology; Ahmedabad Heat Action Plan 2013

  70. Q68 Environment

    The doctrine of 'absolute liability' for enterprises engaged in hazardous activities was laid down by the Supreme Court in:

    1. AM.C. Mehta v. Union of India (Oleum gas leak case, 1987)
    2. BIndian Council for Enviro-Legal Action v. Union of India (1996)
    3. CA.P. Pollution Control Board v. M.V. Nayudu (1999)
    4. DT.N. Godavarman v. Union of India (1996)
    Show answerHide answer

    Answer A. M.C. Mehta v. Union of India (Oleum gas leak case, 1987)

    In the Shriram Food & Fertilisers oleum leak case the Court evolved absolute liability (no exceptions, unlike strict liability in Rylands v. Fletcher). Bichhri (ICELA 1996) applied polluter pays; Godavarman is the forest case; Nayudu applied the precautionary principle.

    Source: M.C. Mehta v. Union of India, AIR 1987 SC 1086

  71. Q69 Environment

    As per Schedule item 8(a) of the EIA Notification 2006, a 'Building and Construction project' requires prior environmental clearance (Category B) when its built-up area is:

    1. A20,000 sq m or more and less than 1,50,000 sq m
    2. B5,000 sq m or more
    3. C10,000 sq m or more
    4. DOnly above 1,50,000 sq m
    Show answerHide answer

    Answer A. 20,000 sq m or more and less than 1,50,000 sq m

    Item 8(a) covers building/construction projects with built-up area ≥20,000 sq m and <1,50,000 sq m; item 8(b) covers townships/area development of ≥50 ha or built-up ≥1,50,000 sq m. Both are Category B appraised by SEIAA.

    Source: EIA Notification 2006, Schedule, items 8(a) and 8(b)

  72. Q70 Environment

    Under the CRZ Notification, 2019, the inter-tidal zone between the Low Tide Line and the High Tide Line is classified as:

    1. ACRZ-II
    2. BCRZ-IV B
    3. CCRZ-I A
    4. DCRZ-I B
    Show answerHide answer

    Answer D. CRZ-I B

    CRZ-I A covers ecologically sensitive areas (mangroves, corals, sand dunes, etc.); CRZ-I B is the inter-tidal zone between LTL and HTL; CRZ-IV B is tidal-influenced water bodies.

    Source: CRZ Notification 2019, para 2 – classification of CRZ

  73. Q71 Acts & Rules

    Section 156 of the MRTP Act says that development permitted under another law is not lawful unless permitted under the MRTP Act. Which of the following is excepted and NOT treated as unauthorised development?

    1. AA layout approved by a private bank for mortgage
    2. BA building approved only by a co-operative housing society
    3. CA structure assessed to property tax by the municipality
    4. DGunthewari development regularised under the Maharashtra Gunthewari Developments (Regularisation, Upgradation and Control) Act, 2001
    Show answerHide answer

    Answer D. Gunthewari development regularised under the Maharashtra Gunthewari Developments (Regularisation, Upgradation and Control) Act, 2001

    s.156 excepts development permitted or deemed permitted by a Village Panchayat within gaothan, and gunthewari development regularised under the 2001 Gunthewari Act.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.156 proviso

  74. Q72 Acts & Rules

    The register of mutations and register of disputed cases are provided for in which section of the Maharashtra Land Revenue Code, 1966?

    1. ASection 154
    2. BSection 149
    3. CSection 155
    4. DSection 150
    Show answerHide answer

    Answer D. Section 150

    s.150 provides for the register of mutations and register of disputed cases. s.149 requires acquisition of rights to be reported, s.155 corrects clerical errors, and s.154 requires registering officers to send intimation of transfers.

    Source: MLRC 1966, s.150

  75. Q73 Acts & Rules

    Under Article 243B, Panchayats at the intermediate level may not be constituted in a State having a population not exceeding:

    1. A10 lakhs
    2. B25 lakhs
    3. C50 lakhs
    4. D20 lakhs
    Show answerHide answer

    Answer D. 20 lakhs

    Article 243B(1) provides for Panchayats at the village, intermediate and district levels, while Art. 243B(2) permits States with a population not exceeding twenty lakhs to dispense with the intermediate level.

    Source: Constitution of India, Art. 243B(2)

  76. Q74 Acts & Rules

    Match the powers of the State Government under the Maharashtra Municipal Corporations Act, 1949:

    (a) s.448 (b) s.451 (c) s.452 (d) s.452A

    (i) Dissolve the Corporation

    (ii) Require performance of duties in default of a municipal authority

    (iii) Appoint Government officer(s) to perform functions of the Corporation

    (iv) Suspend or rescind any resolution or order of the Corporation

    1. Aa-ii, b-iv, c-i, d-iii
    2. Ba-i, b-iv, c-ii, d-iii
    3. Ca-iv, b-ii, c-i, d-iii
    4. Da-ii, b-iv, c-iii, d-i
    Show answerHide answer

    Answer A. a-ii, b-iv, c-i, d-iii

    s.448 is the power to require performance of duties on default, s.451 to suspend or rescind resolutions, s.452 to dissolve the Corporation, and s.452A to appoint officers to run it.

    Source: MMC Act 1949, ss.448, 451, 452, 452A

  77. Q75 Acts & Rules

    The Maharashtra Municipal Corporations Act, 1949 was originally enacted as the Bombay Provincial Municipal Corporations Act, 1949. Which Corporation in Maharashtra is NOT governed by it?

    1. ANashik Municipal Corporation
    2. BPune Municipal Corporation
    3. CNagpur Municipal Corporation
    4. DBrihanmumbai Municipal Corporation
    Show answerHide answer

    Answer D. Brihanmumbai Municipal Corporation

    Every Municipal Corporation in Maharashtra except Brihanmumbai is governed by the MMC Act, 1949 (formerly the BPMC Act). Brihanmumbai is governed by the Mumbai Municipal Corporation Act, 1888.

    Source: MMC Act 1949 (Bombay Act LIX of 1949); Mumbai Municipal Corporation Act 1888

  78. 25 questions to go. Take the rest with a timer and see your score.

    Start free
  79. Q76 Acts & Rules

    Appointment of the Municipal Commissioner is provided in which section of the Maharashtra Municipal Corporations Act, 1949?

    1. ASection 19
    2. BSection 36
    3. CSection 45
    4. DSection 39A
    Show answerHide answer

    Answer B. Section 36

    s.36 deals with appointment of the Commissioner, s.39A with Additional Municipal Commissioners, s.45 with the City Engineer etc., and s.19 with the Mayor and Deputy Mayor.

    Source: MMC Act 1949, s.36

  80. Q77 Acts & Rules

    Match the sections of the Maharashtra Land Revenue Code, 1966:

    (a) s.50 (b) s.51 (c) s.52 (d) s.242

    (i) Regularisation of encroachments

    (ii) Collector's procedure to evict a person wrongfully in possession

    (iii) Removal of encroachment on land vesting in Government

    (iv) Value and land revenue how calculated

    1. Aa-iii, b-i, c-iv, d-ii
    2. Ba-iii, b-iv, c-i, d-ii
    3. Ca-iii, b-i, c-ii, d-iv
    4. Da-i, b-iii, c-iv, d-ii
    Show answerHide answer

    Answer A. a-iii, b-i, c-iv, d-ii

    s.50 removes encroachments on Government land, s.51 regularises encroachments, s.52 explains how value and land revenue are calculated, and s.242 sets out the Collector's procedure for evicting a person in wrongful possession.

    Source: MLRC 1966, ss.50-52, 242

  81. Q78 Acts & Rules

    Regarding a notice under section 53(1) of the MRTP Act, consider:

    (i) For development carried out without permission, or after the permission was revoked, the notice may require restoration within 24 hours.

    (ii) For development contrary to permission or to modified permission, at least one month's notice is given.

    (iii) While an application under section 44 to retain the development is pending, the notice is in abeyance.

    Which are correct?

    1. A(i) and (iii) only
    2. B(ii) and (iii) only
    3. C(i) and (ii) only
    4. D(i), (ii) and (iii)
    Show answerHide answer

    Answer D. (i), (ii) and (iii)

    s.53(1) gives 24 hours for cases under s.52(1)(a) or (c) (no permission, or revoked permission) and one month for (b) or (d). Under s.53(3), an application for retention under s.44 keeps the notice in abeyance until decided.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.53(1), (1A), (3)

  82. Q79 Acts & Rules

    Under section 52A of the MRTP Act, unauthorised developments can be declared 'compounded structures' only if they were completed on or before:

    1. A31st December 2015
    2. B31st March 2012
    3. C1st January 2001
    4. D10th August 1992
    Show answerHide answer

    Answer A. 31st December 2015

    s.52A covers unauthorised developments in Development Plan areas completed on or before 31 December 2015. Once declared compounded, only repairs and maintenance are allowed and reconstruction must follow the current DCR.

    Source: MRTP Act 1966 (as on 28 Jul 2026), s.52A(1),(2)

  83. Q80 Acts & Rules

    What was the key advance of the Bombay Town Planning Act, 1954 over the 1915 Act?

    1. AIt first introduced Town Planning Schemes
    2. BIt created Regional Planning Boards
    3. CIt introduced the levy of development charge as a percentage of ASR
    4. DIt made preparation of a Development Plan for the whole area of a local authority obligatory
    Show answerHide answer

    Answer D. It made preparation of a Development Plan for the whole area of a local authority obligatory

    The 1915 Act provided only for Town Planning Schemes. The 1954 Act required every local authority to prepare a Development Plan for its whole area, with TPSs as the means of implementing it. Regional Boards came with the MRTP Act 1966, and development charge in 1992.

    Source: History: Bombay TP Act 1954 vs 1915

  84. Q81 Land Acquisition

    Under section 30(1) of the RFCTLARR Act, 2013, solatium is payable at what rate of the compensation amount determined under section 27?

    1. A75%
    2. B30%
    3. C100%
    4. D50%
    Show answerHide answer

    Answer C. 100%

    Section 30(1) provides solatium equal to 100% of the compensation amount (market value multiplied by the factor plus value of assets), in consideration of the compulsory nature of acquisition.

    Source: RFCTLARR Act 2013, s.30(1) and First Schedule

  85. Q82 Land Acquisition

    Under section 21 of the RFCTLARR Act, 2013, the public notice calling persons interested to state their claims must fix a date of appearance which is:

    1. ANot less than 15 days and not more than 3 months after publication of the notice
    2. BExactly 30 days after publication of the notice
    3. CNot less than 30 days and not more than 6 months after publication of the notice
    4. DNot less than 60 days and not more than 12 months after publication of the notice
    Show answerHide answer

    Answer C. Not less than 30 days and not more than 6 months after publication of the notice

    Section 21(2) requires the date fixed in the notice to be not less than thirty days and not more than six months after the date of publication of the notice.

    Source: RFCTLARR Act 2013, s.21(2)

  86. Q83 Land Acquisition

    'Acquisition and requisitioning of property' appears as Entry 42 in which List of the Seventh Schedule to the Constitution?

    1. AUnion List (List I)
    2. BState List (List II)
    3. CResiduary powers
    4. DConcurrent List (List III)
    Show answerHide answer

    Answer D. Concurrent List (List III)

    Entry 42 of the Concurrent List (List III) covers acquisition and requisitioning of property, which is why both Parliament (RFCTLARR Act 2013) and State legislatures (Maharashtra amendments of 2018) can legislate on it.

    Source: Constitution of India, Seventh Schedule, List III Entry 42

  87. Q84 Land Acquisition

    Under the Second Schedule of the RFCTLARR Act, 2013, an affected family opting for the annuity policy (ignoring indexation) receives in total over the policy period:

    1. ARs 3.6 lakh
    2. BRs 5.0 lakh
    3. CRs 2.4 lakh
    4. DRs 4.8 lakh
    Show answerHide answer

    Answer D. Rs 4.8 lakh

    Annuity = Rs 2,000 per month x 12 x 20 years = Rs 4,80,000 (indexed to CPI-AL); the alternative one-time payment is Rs 5 lakh.

    Source: RFCTLARR Act 2013, Second Schedule, item 4

  88. Q85 Land Acquisition

    Under section 2(2) of the RFCTLARR Act, 2013, prior consent of affected families is required to the extent of ____ for private projects and ____ for public-private partnership projects.

    1. A80%; 70%
    2. B90%; 80%
    3. C70%; 60%
    4. D75%; 50%
    Show answerHide answer

    Answer A. 80%; 70%

    The first proviso to s.2(2) requires consent of at least 80% of affected families for acquisition for private companies and 70% for PPP projects where ownership of land continues to vest in Government.

    Source: RFCTLARR Act 2013, s.2(2) proviso

  89. Q86 Land Acquisition

    Under section 30(3) of the RFCTLARR Act, 2013, the Collector awards an additional amount at 12% per annum on the market value for the period commencing from:

    1. ADate of publication of the SIA notification under s.4(2) till the award or possession, whichever is earlier
    2. BDate of s.11 notification till the date of payment
    3. CDate of s.19 declaration till the award
    4. DDate of award till the date of possession
    Show answerHide answer

    Answer A. Date of publication of the SIA notification under s.4(2) till the award or possession, whichever is earlier

    Section 30(3) differs from s.23(1A) of the 1894 Act: the 12% runs from the date of publication of the notification of the SIA study under s.4(2) until the award or taking possession, whichever is earlier.

    Source: RFCTLARR Act 2013, s.30(3)

  90. Q87 Land Acquisition

    Under section 64 of the RFCTLARR Act, 2013, a person who was present when the award was made and does not accept it may apply to the Collector for a reference to the Authority within:

    1. ASix weeks from the date of the award
    2. BOne year from the date of the award
    3. CThree months from the date of the award
    4. DSix months from the date of the award
    Show answerHide answer

    Answer A. Six weeks from the date of the award

    Section 64(2)(a): six weeks from the date of the award for those present; in other cases, six weeks from receipt of notice under s.21 or six months from the award, whichever expires first (s.64(2)(b)).

    Source: RFCTLARR Act 2013, s.64(2)

  91. Q88 Valuation

    Which of the following is NOT an example of an easement?

    1. ARight of way over a neighbour's plot
    2. BRight to occupy premises as a tenant for a term of years
    3. CRight of support from an adjoining building
    4. DRight to receive light and air through a window
    Show answerHide answer

    Answer B. Right to occupy premises as a tenant for a term of years

    Rights of way, light and air, support and water flow are typical easements; the right to occupy for a term of years is a lease (an interest in possession), not an easement.

    Source: Indian Easements Act 1882, s.4 illustrations

  92. Q89 Valuation

    Match the kind of value (Column A) with its description (Column B):

    (a) Scrap value (b) Salvage value (c) Book value (d) Distress value

    (i) Value of a property at the end of its utility period without being dismantled

    (ii) Amount shown in the owner's accounts after deducting depreciation from original cost

    (iii) Value of dismantled materials of a building at the end of its life

    (iv) Value realised when the owner is forced to sell under pressure

    1. A(a)-(iii), (b)-(i), (c)-(ii), (d)-(iv)
    2. B(a)-(i), (b)-(iii), (c)-(iv), (d)-(ii)
    3. C(a)-(iii), (b)-(ii), (c)-(i), (d)-(iv)
    4. D(a)-(iv), (b)-(i), (c)-(ii), (d)-(iii)
    Show answerHide answer

    Answer A. (a)-(iii), (b)-(i), (c)-(ii), (d)-(iv)

    Scrap value is the value of dismantled materials; salvage value is the value at the end of the utility period without breaking up; book value is original cost less depreciation as per books; distress value arises from a forced sale.

    Source: Valuation textbook: types of value

  93. Q90 Valuation

    'Ground rent' is the rent paid

    1. Aby a lessee to the freeholder for the land alone, the lessee usually erecting the building
    2. Bby a sub-tenant to the head lessee for the building
    3. Cfor a furnished flat
    4. Das municipal tax on open land
    Show answerHide answer

    Answer A. by a lessee to the freeholder for the land alone, the lessee usually erecting the building

    Ground rent is the rent reserved under a building lease for the bare land; the lessee constructs the building at his own cost and holds it for the lease term.

    Source: Valuation textbook: ground rent

  94. Q91 Valuation Tables

    Match the type of mortgage (Column A) with its feature (Column B) under section 58 of the Transfer of Property Act, 1882:

    (a) Simple mortgage (b) Usufructuary mortgage (c) English mortgage (d) Mortgage by deposit of title deeds

    (i) Mortgagee is put in possession and receives rents/profits in lieu of interest

    (ii) Property is transferred absolutely to the mortgagee subject to re-transfer on repayment

    (iii) Mortgagor binds himself personally and gives the mortgagee a right to have the property sold, without delivering possession

    (iv) Title deeds are delivered to a creditor as security (equitable mortgage)

    1. A(a)-(iii), (b)-(i), (c)-(ii), (d)-(iv)
    2. B(a)-(i), (b)-(iii), (c)-(iv), (d)-(ii)
    3. C(a)-(ii), (b)-(i), (c)-(iii), (d)-(iv)
    4. D(a)-(iii), (b)-(iv), (c)-(ii), (d)-(i)
    Show answerHide answer

    Answer A. (a)-(iii), (b)-(i), (c)-(ii), (d)-(iv)

    Section 58(b) simple mortgage: personal covenant plus power of sale without possession; 58(d) usufructuary: possession and rents to mortgagee; 58(e) English: absolute transfer with proviso for re-transfer; 58(f): deposit of title deeds (equitable mortgage).

    Source: Transfer of Property Act 1882, s.58(b),(d),(e),(f)

  95. Q92 Valuation Tables

    Which of the following interests is most appropriately valued using a dual-rate years' purchase?

    1. AA leasehold interest with 20 years unexpired
    2. BA perpetual annuity from government securities
    3. CAgricultural land held freehold
    4. DA freehold interest let in perpetuity at a secured ground rent
    Show answerHide answer

    Answer A. A leasehold interest with 20 years unexpired

    Dual-rate YP is used for terminable (wasting) interests such as leaseholds, where the investor must recover his capital through a sinking fund by the end of the term; perpetual freehold incomes need no sinking fund and use the single-rate perpetuity YP.

    Source: Valuation textbook: application of dual-rate tables

  96. Q93 Valuation Tables

    The amount of Re.1 per annum (invested at the end of each year) at 5 per cent for 2 years is

    1. A2.000
    2. B2.103
    3. C2.050
    4. D1.907
    Show answerHide answer

    Answer C. 2.050

    Amount of Re.1 p.a. = ((1+i)^n - 1)/i = (1.1025 - 1)/0.05 = 2.05. Check: Re.1 at end of year 1 grows to 1.05, plus Re.1 at end of year 2 = 2.05.

    Source: Formula: Amount of Re.1 p.a. = ((1+i)^n - 1)/i

  97. Q94 Methods of Valuation

    A property let at a rent below the prevailing market rent for the next 5 years, after which it will be re-let at market rent, is best valued by

    1. Acapitalising the market rent in perpetuity without deferment
    2. Bthe contractor's method
    3. Ccapitalising the current rent in perpetuity
    4. Dcapitalising the current rent for 5 years at YP for 5 years and adding the market rent capitalised in perpetuity deferred 5 years
    Show answerHide answer

    Answer D. capitalising the current rent for 5 years at YP for 5 years and adding the market rent capitalised in perpetuity deferred 5 years

    This is a term-and-reversion valuation: the present (lower) rent for the term is capitalised with YP for 5 years, and the reversion to full market rent is capitalised in perpetuity and deferred by 5 years using PV of Re.1.

    Source: Investment method: term and reversion

  98. Q95 Methods of Valuation

    In the belting method of land valuation, the plot is divided into belts parallel to the

    1. Aside boundary
    2. Blonger diagonal
    3. Crear boundary
    4. Droad frontage
    Show answerHide answer

    Answer D. road frontage

    Belting recognises that land nearer the road frontage is more valuable; belts of increasing depth are drawn parallel to the frontage and each successive belt is valued at a reducing proportion of the front belt rate.

    Source: Belting method of valuation

  99. Q96 Methods of Valuation

    Match the depreciation method (Column I) with its formula or characteristic (Column II):

    Column I: (A) Straight line (B) Constant percentage (C) Sinking fund (D) Quantity survey

    Column II: (1) D = C(1-p)^n gives book value (2) Each component of building assessed separately (3) (C-S)/n per year (4) Annual instalment accumulates with compound interest

    1. AA-1, B-3, C-4, D-2
    2. BA-3, B-4, C-1, D-2
    3. CA-2, B-1, C-4, D-3
    4. DA-3, B-1, C-4, D-2
    Show answerHide answer

    Answer D. A-3, B-1, C-4, D-2

    Straight line: equal annual depreciation (C-S)/n; constant percentage: fixed % of the diminishing balance; sinking fund: instalment accumulating at compound interest; quantity survey: detailed item-wise assessment of deterioration.

    Source: Depreciation methods: formulae

  100. Q97 Methods of Valuation

    The method of valuation in which the value of a property is estimated by analysing recent sale instances of similar properties in the locality and adjusting for differences is known as the

    1. Aresidual method
    2. Bcontractor's method
    3. Ccomparative (sales comparison) method
    4. Dprofits method
    Show answerHide answer

    Answer C. comparative (sales comparison) method

    The comparative or market approach relies on evidence of actual transactions of comparable properties; differences in time, location, size, shape and tenure are adjusted to arrive at the value of the subject property.

    Source: Valuation theory: comparative method (Rangwala, Valuation of Real Properties)

  101. Q98 Annual Statement of Rates

    As per the IGR valuation guidelines, to decide whether land recorded as agricultural is actually under cultivation (for applying the agricultural rate), the valuer should examine

    1. Athe 7/12 extracts of the land for the last three years
    2. Bthe electricity bill
    3. Cthe property card
    4. Dthe development plan only
    Show answerHide answer

    Answer A. the 7/12 extracts of the land for the last three years

    The guideline requires examination of the 7/12 extracts for the preceding three years; if the land is not under cultivation or is in a developable zone, the appropriate non-agricultural/developed land rate with permissible deductions is applied.

    Source: IGR Maharashtra valuation guidelines: agricultural land

  102. Q99 Annual Statement of Rates

    As per the Mumbai suburban valuation guidelines, where a plot has the potential of consuming TDR, the ASR land rate is to be

    1. Areduced by 40%
    2. Bkept unchanged
    3. Cincreased by 40%
    4. Dincreased by 25%
    Show answerHide answer

    Answer C. increased by 40%

    The Mumbai guidelines provide that for land on which TDR can be loaded (i.e. development potential beyond basic FSI), the land rate is enhanced by 40% for valuation.

    Source: IGR Maharashtra valuation guidelines (Mumbai): TDR potential

  103. Q100 Annual Statement of Rates

    In the Annual Statement of Rates, a land rate for a zone mainly reflects transactions of small developed plots. When a large undivided parcel ('bulk land') is valued, a lower unit rate is applied because:

    1. ABulk land transactions are exempt from paying stamp duty
    2. BIts layout needs roads, open spaces, development cost and time
    3. CLarge parcels are legally barred from having access roads
    4. DLarge parcels are always located in no-development zones
    Show answerHide answer

    Answer B. Its layout needs roads, open spaces, development cost and time

    A buyer of bulk land must lay out roads and amenities, spend on development and wait to sell plots, so per sq m value is lower than for a ready small plot; the ASR deduction reflects this, much like the developer's (layout) method.

    Source: ASR guidelines (IGR Maharashtra) - bulk land; developer's method of valuation

Want your score and what to study next?

Take this test in Medha AI with a timer and negative marks, or download it as a PDF above.